REPORT # TITLE DATE
ENG 66-1 Allocation of Supplemental Water in the SBVMWD August 1966
ENG 66-2 Capacity Required in the Proposed Non-Reclaimable Waste Outfall for San Bernardino Valley Based on Measured Waste Water Quantities from Industrial Facilities December 1966
ENG 67-1 Analysis and Discussion of Alternate Plans for Reach 18 of the California Aqueduct January 1967
ENG 67-2 Domestic Water Charges for a Typical Homeowner in Various Areas January 1967
ENG 67-3 Projected Tax Rates and Water Charges, 1968-1991, for Feather River Water in SBVMWD, to Meet Payments to the State of California January 1967
ENG 67-4 Population Projection for SBVMWD January 1967
ENG 67-5 Survey of Waste Water Disposal Facilities in the Bunker Hill-San Timoteo Area Discharging More Than Ten Acre Feet Per Year, With Effluent Quantities February 1967
ENG 67-6 Study of Water Rates and Meter Charges in Each of Four Cities, Two County Water Districts, and One Improvement District in the SBVMWD, and Cities of Fontana and Riverside February 1967
ENG 67-7 The Effects of Water Supply Management on Water Quality in the Santa Ana River Basin March 1967
ENG 67-8 Feather River Project: Long Term Average Cost of Water to SBVMWD March 1967
ENG 67-9 Proceedings of the Second Meeting of the San Bernardino Valley Non-reclaimable Waste Outfall Technical Review Committee, March 1, 1967 March 1967
ENG 67-0E Subsurface Inflows and Outflows in San Bernardino Valley (Bunker Hill - San Timoteo Area) March 24, 1967
ENG 67-10 Stream Diversions in the Bunker Hill - San Timoteo Area June 1967
ENG 67-11 SBVMWD Engineering Staff Review of enclosure No. 4 of Phase I of the Alternate Transmission System Studies Made by the San Bernardino Valley Engineers June 1967
ENG 67-12 Analysis of Alternate Power Costs for the Mentone Pumping Plant July 1967
ENG 67-13 Projected Tax Rates and Water Charges, 1968-1991, for Feather River Water in SBVMWD, to Meet Payments to the State of California, Based on Charges Given in DWR Bulletin No. 132-67 (Supersedes ENG 67-3) August 1967
ENG 67-14 Artificial Recharge in the Bunker Hill - San Timoteo Area August 1967
ENG 67-15 Preliminary Report Water Supply and Storage, Southwesterly Area-Improvement District A, Summary and Conclusions  
ENG 67-E1 Review of Back Taxes Relative to Annexation No. 14 to the SBVMWD June 20, 1967
ENG 67-E2 Review of Proposed Cottonwood Powerplant Deferment July 12, 1967
ENG 07-06-67 Outline of the San Bernardino Valley Engineers' Method for Estimating Imported Water Requirements for the SBVMWD in the Future July 6, 1967
ENG 68-1 Study of Costs for Construction, Capital, Power, Operation and Maintenance of San Bernardino Valley's Engineer's Alternate Distribution Systems January 17, 1968
ENG 68-2 SBVMWD Cooperative Water Supply Plan May 13, 1968
ENG 68-3 Review of Cost Allocations & Power Recovery Potential of the California Aqueduct from Reach 18A through Reach 28G October 25, 1968
ENG 68-4 Projected Tax Rates and Water Charges, 1968-1991, for State Feather River Water in SBVMWD, to Meet Payments to the State of California, Based on Given Charges  in DWR Bulletin 132-68 (Supersedes ENG-67-13 and ENG-67-3) August 1968
ENG 68-E1 Alternative Sources for Additional Water Supplies for the South Mesa Mutual Water Company Prior to the Arrival of Feather River Water, With a Recommended Rate Schedule for Water Purchased By South Mesa from Improvement District A January 5, 1968
ENG 68-E2 Study of Costs and Beneficial Uses of an Additional 4600 Acre-Feet Per Year of Feather River Water That is Available to the SBVMWD from the DWR January 12, 1968
ENG 68-E3 Preliminary Information from the DWR on Groundwater Storage in the Yucaipa and Beaumont Areas March 6, 1968
ENG 68-E4 SBVMWD Rainfall Study First Phase Results March 6, 1968
ENG 68-E5 The Impact of Additional 4600 Acre-feet Per Year of State Project Water on the SBVMWD March 15, 1968
ENG 68-E6 Cost Comparison of Alternate Feather River Water Transmission Pipeline Plans to Supply the Yucaipa Area September 30, 1968
ENG 68-E7 Geophysical Study of the San Andreas Rift in the SBVMWD Conducted by Dr. Stephen W. Dana November 15, 1968
ENG 68-E8 Earthquake Considerations in the Design of the SBVMWD Water Transmission System November 25, 1968
ENG 69-E1 A Review of the Metropolitan Water Exchange Agreements with the Desert Water Agency and the Coachella Valley County Water District April 25, 1969
ENG 69-E2 Hydrology and Sedimentation Study of the Area Tributary to the Proposed Yucaipa Dam and Reservoir Site Prepared in Cooperation with the Yucaipa Valley Soil Conservation District May 19, 1969
ENG 69-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1968 July 23, 1969
ENG 69-E4 Area Within the Boundaries of the SBVMWD Including Annexation Data September 12, 1969
ENG 69-E5 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1969 September 15, 1969
ENG 70-1 Projected Tax Rates and Water Charges, 1968-1991, for State Feather River Water in SBVMWD, to Meet Payments to the State of California, Bases on given Charges in DWR Bulletin 132-69 (Supersedes ENG-68-4) March 1970
ENG 70-3 Projected Tax Rates and Water Charges, 1968-1991, for State Feather River Water in SBVMWD, to Meet Payments to the State of California, Based on Given Charges in DWR Bulletin 132-70 (Supersedes ENG-70-1) October 1970
ENG 70-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1969 March 6, 1970
ENG 70-E2 Cooperative Program With the City of Colton to Determine an Optimum Treatment Plant Site for Feather River Water Supply Delivered Throughout the SBVMWD Barton Road  Turnout April 1970
ENG 70-E3 A Gravimetric Survey of the Yucaipa Quadrangle June 1970
ENG 70-E4 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1970 July 27, 1970
ENG 70-E5 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1970 January 29, 1970
ENG 71-1 SBVMWD Water Resources Management and AB 2526 June 1971
ENG 71-2 Projected Tax Rates and Water Charges, 1968-1991, for State Feather River Water in SBVMWD, to Meet Payments to the State of California, Based on Given Charges in DWR Bulletin 132-71 (Supersedes ENG-70-3) August 1971
ENG 71-E1 Fluctuation of Water Levels in Wells in the Yucaipa Area October 1971
ENG 72-E1 Reference Information Regarding the WMWD vs. ESBCWD Judgment Safe Yield Study "Black Line" Boundary Problem February 15, 1972
ENG 72-E2 The Potential for a Joint-Pipeline Facility to Deliver Feather River Water from the California Aqueduct at Devil Canyon to the SBVMWD, SGPWA, DWA, and CVCWD March 8, 1972
ENG 72-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1971 April 11, 1972
ENG 72-E4 Operations Startup Preparations Progress Report August 29, 1972
ENG 72-E5 Area Within the Boundaries of the SBVMWD Including Annexation Data September 6, 1972
ENG 73-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1972 July 2, 1973
ENG 73-E2 A Guide to Bunker Hill - San Timoteo Area Stream Gage Records Through Water Year 1970 September 1973
ENG 73-E3 Ground Water Basin Operation and Economics: Bunker  Hill-San Timoteo Area Analysis of Additional Alternative Plans of Basin Operation November 1973
ENG 73-E4 Water Supply Availability Study for the City of Redlands Tate Treatment Plant December 1973
ENG 74-E1 Fluctuation of Water Levels in the East Twin Creek Observation Wells December 1970 - January 1974 April 1974
ENG 74-E2 Increased Groundwater Supply as a Result of Importation of  State  Project Water January 1, 1973 through December 31, 1973 April 1974
ENG 74-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1973 May 2, 1974
ENG 74-E4 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1973 May 2, 1974
ENG 74-E5 Economic Benefits of Artificial Recharge in the San Bernardino Basin August 1974
ENG 74-E6 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1974 August 29, 1974
ENG 75-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1974 February 28, 1975
ENG 75-E2 Proposal for Computer System Replacement March 17, 1975
ENG 75-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1975 November 12, 1975
ENG 76-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1975 May 17, 1976
ENG 76-E2 Fluctuation of Water Levels in the Yucaipa Area 1965-1975 July 1976
ENG 76-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1976 December 23, 1976
ENG 77-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1976 April 27, 1977
ENG 77-E2 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1977 October 7, 1977
ENG 77-E3 Reconstruction of a Public Supply Water Well for Observation Purposes November 1977
ENG 78-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1977 June 30, 1978
ENG 78-E2 Information for the Southern California Edison Company on the Santa Ana River-Mill Creek Cooperative Water Project as it Relates to Proposed Water Diversions June 30, 1978
ENG 78-E2 APPENDIX Information for the Southern California Edison Company on the Santa Ana River-Mill Creek Cooperative Water Project as it Relates to Proposed Water Diversions - APPENDIX June 30, 1978
ENG 78-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1978 October 19, 1978
ENG 79-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1978 April 17, 1979
ENG 79-E2 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1979 November 1979
ENG 80-E1 Acreage Within the Boundaries of the San Bernardino Valley Municipal Water District January 15, 1980
ENG 80-E2 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1979 May 1980
ENG 80-E3 Upper Santa Ana Valley Cooperative Well Measuring Program - Spring 1980 December 1980
ENG 81-E1 Upper Santa Ana Valley Cooperative Well Measuring Program - Fall 1980 April 1981
ENG 83-E1 Fluctuation of Water Levels in the Yucaipa Area May 1983
NO ENG # Friction Slope for Q and Pipe Diameter N=0.012 No date
Enter Username

Enter Password


Forgot Password
Item 1 Title
Item 1 Title
Item 1 Title
Item 1 Title
Item 1 Title
Item 1 Title
Item 1 Title
Employment
Information and Application Form